There are two types of portfolios utilized in the VP-CIO Area:
- VP-CIO Portfolio – VP-CIO Area strategic projects
- Team-specific Portfolios
A project can only be associated with one portfolio. Projects can and will transition between the VP-CIO Portfolio and Team-specific portfolios as warranted, by improved clarity &/or scope clarifications during the project lifecycle.
The color coded portfolios are either fully or partially managed within the VP-CIO Area PPM tool.